R&D Progress
PROGRESS

R&D Progress

PUBLIC-SAFE R&D PROGRESS

R&D progress and grant-ready evidence

Automatically generated from already-recorded AI Life state. This page exposes release, research and evidence signals that are useful for accountability while deliberately withholding private Work, commercial leads, credentials, raw diagnostics, partner-confidential details and exact internal costs.

Window: 2026-08-03 — 2026-10-31 · generated 2026-10-31T09:00:56+00:00

Current measurable signals

Release0.9.221

Current plugin release; version changes are engineering boundaries, not automatically experiment-epoch changes.

Public evidence4

Public-scope evidence ledger records in the last 90 days.

Controlled experiments0

Completed formal experiment records in the last 90 days; count does not imply positive results.

Experiment runs0

Recorded experiment-arm runs in the last 90 days.

KPI snapshots114

Versioned measurement snapshots in the selected public progress window.

Open Runtime1.1.0

Portable reference runtime version; private production data and model weights are not bundled.

What these numbers do — and do not — mean

They are evidence of recorded engineering/research activity, not automatic proof of scientific success, subsidy eligibility, milestone achievement or regulatory compliance. Exact provider spend is kept in the authenticated reporting area because cost structure can be commercially sensitive. Personnel hours, payroll, invoices and grant-eligible accounting are not inferred from AI Life telemetry.

Current experiment epoch: epoch_20260929_074851_f5dd0e17bd · protocol: experimental-core-v1-2026-09-26 · started: 2026-09-29T07:48:51+00:00

Automatic planning timeline

The working timeline is generated from configured work packages and project dates, and linked to the current experiment epoch. If official dates are missing, working dates are explicitly marked as auto-derived rather than approved commitments.

Timeline: 2026-10-31 — 2027-10-30 · date source: working_timeline_auto_derived · observed planning obstacles: 5

WP1

Continuity invariants across model/runtime change

2026-10-31 — 2027-01-29 · ACTIVE

Milestone achievement: not automatically asserted.

WP2

Reproducible high-assurance evaluation

2027-01-30 — 2027-04-30 · PLANNED

Milestone achievement: not automatically asserted.

WP3

Portable and privacy-bounded runtime

2027-05-01 — 2027-07-30 · PLANNED

Milestone achievement: not automatically asserted.

WP4

External strategic-industry pilot

2027-07-31 — 2027-10-30 · PLANNED

Milestone achievement: not automatically asserted.

Grant-readiness development programme

These work packages are the current internal grant-readiness baseline. They must be reconciled to the signed application or Grant Agreement before they can be treated as approved milestones.

WP1

Continuity invariants across model/runtime change

Specify which persistent-agent state must survive, which state may change, and how violations are detected across versioned migrations.

WP2

Reproducible high-assurance evaluation

Expand fault injection, frozen-state evaluation and drift measurement with explicit null/failure reporting.

WP3

Portable and privacy-bounded runtime

Reduce provider coupling while preserving provenance, privacy boundaries, recovery semantics and cost observability.

WP4

External strategic-industry pilot

Test transferability on a bounded non-classified external workflow using predeclared metrics, stop/go criteria and privacy boundaries.

Public reporting boundary

  • No private steward chats, Work plans, request messages or unpublished resident work.
  • No business-lead identities, partner names or confidential pilot details.
  • No credentials, raw logs, diagnostic payloads or visitor identifiers.
  • No exact provider/API spend, personnel cost or internal budget on this public page.
  • No automatic claim that a configured subsidy milestone has been achieved.